Posted: Thu Dec 10, 2009 9:19 am Post subject: Boeing completes 747-8 Freighter engine runs
Boeing completes 747-8 Freighter engine runs
Boeing successfully completed the first engine runs for the 747-8 Freighter. The milestone marks another step in the 747 program's steady progress in preparing for flight test.
"We are very pleased with the engines' performance during this test," said Mo Yahyavi, vice president and general manager of the 747 program. "The engines and all the systems performed as expected."
Engine runs began slightly before 10 a.m. (PST) Tuesday. During initial engine runs, the engines are started and operated at various power settings to ensure all systems perform as expected. The engine run test began with the auxiliary power system providing power to start the first of four General Electric GEnx-2B engines. The remaining three engines were started using the cross-bleed function.
Basic systems checks continued throughout the test. The engines were powered down and inspected and will be restarted following a technical review. The team completed a vibration check and monitored the shutdown logic to ensure it functioned as expected.
Source: Boeing
J430 PIREP Master Blaster
Joined: 01 Oct 2006 Posts: 1229 Location: Brisbane QLD.
Posted: Tue Feb 09, 2010 7:41 am Post subject:
And here she goes, 8th of Feb 2010, the first flight of the new generation of 747.
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum